Train and tube services affected by engineering works
If you are planning to travel over the next few weekends the following lines are affected by engineering works.
Sunday 9 April
The lines between Barnes and Feltham via Twickenham will be closed all day Sunday for re-signalling work.
· Trains between London Waterloo and Reading will be diverted via Brentford and Hounslow. These trains will also call at Barnes and Hounslow to connect with the replacement buses.
· Trains between London Waterloo and Windsor will be diverted via Brentford and Hounslow and will make extra stops to cover other altered services. These trains will call at Barnes and Hounslow to connect with the replacement buses.
· Trains to and from Woking via Hounslow and Staines will run to a near normal timetable.
· Replacement bus services will run between Barnes and Hounslow via Richmond and Twickenham to connect with the above train services.
· The “Kingston Loop” circular service will be altered to run between London Waterloo and Shepperton via Wimbledon and Kingston.
· Replacement bus services will run between Teddington and Barnes via Twickenham.
Use the links below for timetables of altered train services and replacement buses.
Friday 14 to Monday 17 April
No service between Hammersmith and Edgware Road
No service between Hammersmith and Edgware Road
Saturday 22 and Sunday 23 April
No service between Hammersmith and Edgware Road
Saturday 22 and Sunday 23 April
No service between Hammersmith and Edgware Road
Saturday 29, Sunday 30 April and Monday 1 May
No service between Shepherd's Bush and Willesden Junction
Saturday 6 and Sunday 7 May
No service between Shepherd's Bush and Willesden Junction
Saturday 6 and Sunday 7 May
No service between High Street Kensington and Edgware Road
No planned engineering works
No planned engineering works
The information above is specific to West and South West London. There may be disruption elsewhere on local transport networks.
April 5, 2017
|